Some types of meters integrating a galvanic isolation also behave as PLC signal
cutters. However, these models are relatively rare and most meters allow the
PLC signal to pass.
In both cases, it may be useful to override these devices to allow the PLC signal
to extend over the entire electrical network.
Transformers
Since transformers are inherently electrical devices ensuring a physical isolation
between two electrical circuits with a different voltage, they cannot be used to con-
vey the PLC signal between the two parts of the network. In this case, it is necessary
to add a PLC device to the transformer; this device is used to retrieve the PLC signal
from one side of the transformer and to reinject it on the other side by re-amplifying
it so that the signal travels all over the LV electrical network up to the PLC modem
of the end user.
Figure 7.27 illustrates the transformer overriding principle with the various PLC
signal injection points and the PLC modem of the end user located behind the meter.
A PLC device used to override a transformer can only be installed by teams
accredited by the electrical network operator. This is because it is necessary to have
access to the MV/LV (medium voltage to low voltage) transformer vault.
Meters
Meters are used to measure the electrical consumption of a house and to invoice the
users of the electrical network or of another state-owned electrical company. These
144 Equipment
Figure 7.27 Transformer overriding
Zobrazit stránku 162