Zyxel-communications Broadband Security Gateway P-312 Uživatelský manuál Strana 35

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 254
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 34
P312 Broadband Security Gateway
Hardware Installation & Initial Setup 2-1
Chapter 2
Hardware Installation & Initial Setup
This chapter shows you how to connect the hardware and perform the initial setup.
2.1 Front Panel LEDs and Back Panel Ports
2.1.1 Front Panel LEDs
The LEDs on the front panel indicate the operational status of the Prestige.
Figure 2-1 Front Panel
The following table describes the LED functions:
Table 2-1 LED functions
LEDs Function Indicator
Status
Active Description
PWR Power Green On The power adapter is connected to the Prestige.
Off The system is not ready or failed.
On The system is ready and running.
SYS System
Flashing The system is rebooting.
Green Off The 10M LAN is not connected.
On The Prestige is connected to a 10M LAN.
10M LAN LAN
Flashing The 10M LAN is sending/receiving packets.
Off The 100M LAN is not connected.100M LAN Orange
On The Prestige is connected to a 100Mbps LAN.
Zobrazit stránku 34
1 2 ... 30 31 32 33 34 35 36 37 38 39 40 ... 253 254

Komentáře k této Příručce

Žádné komentáře